E30 Krzeszowice - Kraków Mydlniki

2018
CONTRACTOR:
Vias Y Construcciones S.A.
QUANTITY: 300,00 m2 | 501,60 m2
PRODUCT: MATA
TYPE: 600/20 | 600/15

The 15.7 km section of the E30 line between Krzeszowice and Kraków Mydlniki station underwent renovation in 2018. As part of the work, viaducts were modernised, including those with a steel structure (e.g. on the Rudawa River). In order to reduce the vibrations affecting the structure of the structures – generated by rail vehicles – vibration isolation sub-ballast mats supplied by Epufloor were used.