E30 wiadukt

km 38,150

2018
CONTRACTOR:
Budimex S.A.
QUANTITY: 3 619,20 m2
PRODUCT: MATA
TYPE: 500/30

The project “Modernisation of the E30 railway line, stage II, section Zabrze-Katowice-Krakow. Tender 2 – Modernisation of the Trzebinia – Krzeszowice section (km 29.110-46.700 of line no. 133)’ included the application of vibro-acoustic insulation on the viaduct over the Dulówka River to reduce secondary noise generated by the structure and extend the service life of the facility. The mats supplied by Epufloor were installed in March 2019, achieving the intended results.