Krakow, Ptaszyckiego Street

2022
CONTRACTOR:
ZUE S.A.
QUANTITY: 4 670 m2
PRODUCT: PROFILE
TYPE: 49E1 SN

In 2022, ZUE Group S.A. modernised the tram track in the line of Aleja Jana Pawła II and Tadeusza Ptaszyckiego in Kraków. For the purpose of this project, Epufloor, guided by the suggestions and requirements of Grupa ZUE S.A. in relation to the construction of the potted track bed, developed a non-standard shape of rail profiles, meeting all the Contractor’s requirements. As a result, Epufloor supplied EVO 49E1 SN2 670 inserts for 4670 mb of 49E1 rail and EVO 60R2 SWD 670 TOR-35mm inserts for 1520 mb of 60R2 rail.