Budimex, the general contractor for the section of line LK7 between Otwock and Pilawa, was looking for a system solution to provide vibro-acoustic insulation for the LCS Pilawa building. After considering various offers, it was decided to use the 500/25 vibration isolation mats offered by Epufloor.