LK183 Dąbrowa Górnicza subway
2019
CONTRACTOR: Nowak Mosty sp. z o.o.
QUANTITY: 88,80 m2
PRODUCT: MATA
TYPE: 500/25
In a narrow isthmus, between the picturesque Kuźnica Warężyńska and Pogoria III reservoirs, a tunnel was designed under the LK183 line, which has become a local tourist attraction due to the rare painting of the structure. The design of the tunnel included the use of vibro-acoustic insulation to reduce the dynamic impact on the structure and thus reduce secondary noise inside the tunnel. The contractor chose the mats proposed and subsequently supplied by Epufloor.
