2018 CONTRACT: Budmech Hydroizolacje sp. z o.o. QUANTITY: 2 888,00 m2 PRODUCT: MATA TYPE: 500/15
The modernised section of the LK20 line, between Warsaw West and Warsaw Gdanski, runs in the very centre of the city. The mats, supplied by Epufloor, were installed on a steel viaduct over Wolska Street, at the junction with Prymas Tysiąclecia Avenue.