Łódź, Zgierska – Leafy

2022
CONTRACTOR:
Db Construct sp. z o.o.
QUANTITY: 16,08 m2
PRODUCT: PROFILE
TYPE: 49E1 SN

Strategy for the development of the cycling network in Lodz, entails changes. Cyclist-friendly changes. As part of the extension of the cycle paths, the existing pedestrian crossing of the tramway track at the junction of Leafy and Zgierska Streets was extended to include a crossing for cyclists. Epufloor profiles were used in the construction of the crossing.