Zabrze, Wolności Street
2022
CONTRACTOR: Prefa sp. z o.o.
QUANTITY: 1 291,2 m2
PRODUCT: MATA
TYPE: 500/25
The renovation of a section of the tram line in Zabrze, in the course of Wolności Street, assumed the use of prefabricated concrete slabs laid on vibro-acoustic insulation in the construction of the track bed. The contractor considered Eputrack mats to be the best available solution and decided to install them in the track bed.
